Showing posts with label leed construction. Show all posts
Showing posts with label leed construction. Show all posts
Friday, January 11, 2013
Get a Charge Outta Conservation
Next time you're at TradeCenter 128, recharge your electric vehicle's battery while recharging your "virtual battery" at Beacon Grille! This complimentary service is offered to patrons while doing business in the park and is one more way Cummings Properties encourages conserving natural resources.
Tuesday, June 1, 2010
Solar Facade
A new 30,000 watt photo voltaic solar panel array has been installed at 8 Cabot Road in Woburn and will generate approximately 40 percent of the energy used by common area systems. Cummings’ previous solar arrays (at TradeCenter 128) were installed entirely on the parking garage roof. At 8 Cabot, 20 of the 110 panels are installed on the building’s façade. They act as awnings over the south-facing windows, further saving cooling energy and are visible reminders of the building’s energy-saving features.
Subscribe to:
Posts (Atom)